Contact

Kjetil Jonsson

Perforating (TCP) Service & Product Line Manager
Phone: +47 51 30 88 85

Perforating is essential in delivering wells, improving well performance, Plug and Abandonment (P&A), and remedial work during the lifetime of a well.

Archer provides various shaped charges including patented liner material technology, which ensures cleaner perforation tunnels for increased well productivity.

Archer`s extensive P&A experience, combined with our tailor-made perforating systems, ensures time efficient and optimized P&A operations.

Associated TCP Services

In addition to standard and specialized Tubing Conveyed Perforating (TCP) services, we offer associated services, including:

  • Punching
  • Explosive and electro-mechanical pipe-cutting
  • Pyrotechnic and plug setting horizontal pump-down “plug and shoot”
  • Coil tubing perforating
  • Wireline perforating
  • Casing patch

Aligned with the Stronghold perforate wash cement systems, Archer's TCP services ensure an efficient and safe execution of operations, bringing time and cost savings to our customers.

Related Challenges

Decommissioning

A large number of oil and gas assets are coming to the end of their designed life expectancy and need to be decommissioned safely, securely and cost effectively.


Learn More

Well Integrity

Well integrity is concerned with the safe and reliable containment of all well fluids throughout the life of a well, including after decommissioning.


Learn More