Contacts

Select a local Contact

Lars Harald Norheim

Director Business Development & Sales

Arild Helleren

Region Director, Asia Pacific
Phone: +60 12 304 3681

Brett Hrabovsky

Area Manager Oiltools North America
Phone: +1 (281) 785 9222

Nordine Benyahia

Business Development Manager, Angola
Phone: +244 943 254 580

Vaughn Griffin

Region Director, Middle East
Phone: +971 552 3333 86

Bjørn Bærheim

Region Director, Europe & Africa
Phone: + 47 51 30 81 70

Bjørn Bærheim

Region Director
Phone: + 47 51 30 81 70

Kenneth Bertram

Country Manager
Phone: +44 01224 767677
Cflex® technology enables high-performance multistage cementing. Qualified “gas tight” equivalent to ISO 14998 (formerly ISO 14310) and with a permanent lock system, Cflex® performs to the highest integrity standards.

Installing Cflex® at one or more casing joints gives operators flexibility, reliability and far greater confidence in cementing operations.

Despite advances in cement technology, annulus integrity is one of the biggest challenges facing the industry, both in terms of frequency and impact. The Cflex® cementing system improves annular seal integrity and overcomes the shortcomings of previous stage cementing technology.

Applications
  • Controlled, secure and selective access to casing annulus
  • Multistage cementing
  • Annulus cleanout
  • Fracturing
 Specifications
Size, in 7 - 16
Temperature rating, degF [degC] 40 - 302 [4-150]
Standard material Carbon steel
Elastomer material HNBR
Permanent lock pressure, psi 3,000
Max. flow gal/min 580`
Qualification Equivalent to ISO 14310 V0

Related Challenges

Decommissioning

A large number of oil and gas assets are coming to the end of their designed life expectancy and need to be decommissioned safely, securely and cost effectively.


Learn More

Well Integrity

Well integrity is concerned with the safe and reliable containment of all well fluids throughout the life of a well, including after decommissioning.


Learn More